| # Copyright (C) 2019 The Android Open Source Project | |
| # | |
| # Licensed under the Apache License, Version 2.0 (the "License"); | |
| # you may not use this file except in compliance with the License. | |
| # You may obtain a copy of the License at | |
| # | |
| # http://www.apache.org/licenses/LICENSE-2.0 | |
| # | |
| # Unless required by applicable law or agreed to in writing, software | |
| # distributed under the License is distributed on an "AS IS" BASIS, | |
| # WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied. | |
| # See the License for the specific language governing permissions and | |
| # limitations under the License. | |
| # This file is intentionally minimal. Standalone Perfetto builds use bzlmod | |
| # (see MODULE.bazel). This WORKSPACE file exists only for compatibility with | |
| # older Bazel versions that don't support bzlmod. | |
| # | |
| # Embedders who depend on Perfetto via WORKSPACE should use deps.bzl: | |
| # load("@perfetto//bazel:deps.bzl", "perfetto_deps") | |
| # perfetto_deps() | |
| workspace(name = "perfetto") |