| #!/usr/bin/env python3 | |
| # Copyright (C) 2024 The Android Open Source Project | |
| # | |
| # Licensed under the Apache License, Version 2.0 (the "License"); | |
| # you may not use this file except in compliance with the License. | |
| # You may obtain a copy of the License at | |
| # | |
| # http://www.apache.org/licenses/LICENSE-2.0 | |
| # | |
| # Unless required by applicable law or agreed to in writing, software | |
| # distributed under the License is distributed on an "AS IS" BASIS, | |
| # WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied. | |
| # See the License for the specific language governing permissions and | |
| # limitations under the License. | |
| import os | |
| import sys | |
| ROOT_DIR = os.path.dirname(os.path.dirname(os.path.abspath(__file__))) | |
| sys.path.append(ROOT_DIR) | |
| ANDROID_SDK_DIR = os.path.join(ROOT_DIR, 'buildtools', 'android_sdk') | |
| if not os.path.exists(ANDROID_SDK_DIR): | |
| print("""Could not find hermetic Android SDK installation. | |
| Please run: 'tools/install-build-deps --android'""") | |
| sys.exit(1) | |
| ANDROID_NDK_DIR = os.path.join(ROOT_DIR, 'buildtools', 'ndk') | |
| if not os.path.exists(ANDROID_NDK_DIR): | |
| print("""Could not find hermetic Android NDK installation. | |
| Please run: 'tools/install-build-deps --android'""") | |
| sys.exit(1) | |
| os.environ['ANDROID_HOME'] = ANDROID_SDK_DIR | |
| os.environ['ANDROID_NDK_HOME'] = ANDROID_NDK_DIR | |
| # There are two ways to provide Android SDK and NDK locations to a Bazel build: | |
| # 1. Using standard environment variables (ANDROID_HOME and ANDROID_NDK_HOME) | |
| # 2. Using the 'android_sdk_repository_extension.configure' API in the | |
| # MODULE.bazel file | |
| # | |
| # The second option overrides the environment variables that are usually | |
| # already set on the developer's machine. | |
| # This leads to a situation where the `adb` tool used to push Android tests to | |
| # the local device or emulator during the build differs from the version already | |
| # running (e.g., used by the Android Studio Logcat viewer). | |
| # When this happens, the ADB daemon restarts, leading to slower test execution | |
| # and sometimes obscure test errors. | |
| # To overcome this, we enforce the use of environment variables | |
| # only when using this 'tools/bazel' script, which allows developers to use a | |
| # local version of Bazel together with the local version of the SDK and NDK. | |
| # We explicitly specify the required Android SDK version in MODULE.bazel, which | |
| # ensures that if the local SDK is used, it is the correct version. | |
| __package__ = 'tools' | |
| from .run_buildtools_binary import run_buildtools_binary | |
| run_buildtools_binary(['bazel'] + sys.argv[1:]) |