| #!/usr/bin/env python3 | |
| # Copyright (C) 2021 The Android Open Source Project | |
| # | |
| # Licensed under the Apache License, Version 2.0 (the "License"); | |
| # you may not use this file except in compliance with the License. | |
| # You may obtain a copy of the License at | |
| # | |
| # http://www.apache.org/licenses/LICENSE-2.0 | |
| # | |
| # Unless required by applicable law or agreed to in writing, software | |
| # distributed under the License is distributed on an "AS IS" BASIS, | |
| # WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied. | |
| # See the License for the specific language governing permissions and | |
| # limitations under the License. | |
| # !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! | |
| # DO NOT EDIT. Auto-generated by tools/gen_amalgamated_python_tools | |
| # !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! | |
| # This file should do the same thing when being invoked in any of these ways: | |
| # ./traceconv | |
| # python traceconv | |
| # bash traceconv | |
| # cat ./traceconv | bash | |
| # cat ./traceconv | python - | |
| BASH_FALLBACK=""" " | |
| exec python3 - "$@" <<'#'EOF | |
| #""" # yapf: disable | |
| # ----- Amalgamator: begin of python/perfetto/prebuilts/manifests/traceconv.py | |
| # This file has been generated by: tools/release/roll-prebuilts v54.0 | |
| TRACECONV_MANIFEST = [{ | |
| 'arch': | |
| 'mac-amd64', | |
| 'file_name': | |
| 'traceconv', | |
| 'file_size': | |
| 11174856, | |
| 'url': | |
| 'https://commondatastorage.googleapis.com/perfetto-luci-artifacts/v54.0/mac-amd64/traceconv', | |
| 'sha256': | |
| '554ecfa7fff1ed35ed0d046e244d42d27b5e9f0067b08db68e5cb7f9eace879a', | |
| 'platform': | |
| 'darwin', | |
| 'machine': ['x86_64'] | |
| }, { | |
| 'arch': | |
| 'mac-arm64', | |
| 'file_name': | |
| 'traceconv', | |
| 'file_size': | |
| 10357864, | |
| 'url': | |
| 'https://commondatastorage.googleapis.com/perfetto-luci-artifacts/v54.0/mac-arm64/traceconv', | |
| 'sha256': | |
| '3976ef9871626ce28ceb32a36c657505a21f63c02837bb0ea51081412d79f4d7', | |
| 'platform': | |
| 'darwin', | |
| 'machine': ['arm64'] | |
| }, { | |
| 'arch': | |
| 'linux-amd64', | |
| 'file_name': | |
| 'traceconv', | |
| 'file_size': | |
| 11352048, | |
| 'url': | |
| 'https://commondatastorage.googleapis.com/perfetto-luci-artifacts/v54.0/linux-amd64/traceconv', | |
| 'sha256': | |
| '419bc40b76f23a5705def8624d5fdf31fd42ba1e3816fd056bf93f431cc156d1', | |
| 'platform': | |
| 'linux', | |
| 'machine': ['x86_64'] | |
| }, { | |
| 'arch': | |
| 'linux-arm', | |
| 'file_name': | |
| 'traceconv', | |
| 'file_size': | |
| 8655236, | |
| 'url': | |
| 'https://commondatastorage.googleapis.com/perfetto-luci-artifacts/v54.0/linux-arm/traceconv', | |
| 'sha256': | |
| '086721b87c8d3d865fb063f3f6e65127457884eb8e5da9f78eae2313a7383772', | |
| 'platform': | |
| 'linux', | |
| 'machine': ['armv6l', 'armv7l', 'armv8l'] | |
| }, { | |
| 'arch': | |
| 'linux-arm64', | |
| 'file_name': | |
| 'traceconv', | |
| 'file_size': | |
| 10772720, | |
| 'url': | |
| 'https://commondatastorage.googleapis.com/perfetto-luci-artifacts/v54.0/linux-arm64/traceconv', | |
| 'sha256': | |
| '1faf695042ccc907d66d663928a2c62d8f5ece16623f97a3a3260cda67e8e15a', | |
| 'platform': | |
| 'linux', | |
| 'machine': ['aarch64'] | |
| }, { | |
| 'arch': | |
| 'android-arm', | |
| 'file_name': | |
| 'traceconv', | |
| 'file_size': | |
| 8664936, | |
| 'url': | |
| 'https://commondatastorage.googleapis.com/perfetto-luci-artifacts/v54.0/android-arm/traceconv', | |
| 'sha256': | |
| 'ccd20eb089b956e2229062680b991ec6f526332353ada57ca034dae2667c481f' | |
| }, { | |
| 'arch': | |
| 'android-arm64', | |
| 'file_name': | |
| 'traceconv', | |
| 'file_size': | |
| 10696848, | |
| 'url': | |
| 'https://commondatastorage.googleapis.com/perfetto-luci-artifacts/v54.0/android-arm64/traceconv', | |
| 'sha256': | |
| 'ba2ecc2978fd28e1a6e629e13a54d365c7f9cb0828dbf9aea27e585f1b79a030' | |
| }, { | |
| 'arch': | |
| 'android-x86', | |
| 'file_name': | |
| 'traceconv', | |
| 'file_size': | |
| 11869456, | |
| 'url': | |
| 'https://commondatastorage.googleapis.com/perfetto-luci-artifacts/v54.0/android-x86/traceconv', | |
| 'sha256': | |
| '5c659c672126e844ec8465bcb224ebeddf702f411756f5bbc1168d61d3312ce7' | |
| }, { | |
| 'arch': | |
| 'android-x64', | |
| 'file_name': | |
| 'traceconv', | |
| 'file_size': | |
| 11188840, | |
| 'url': | |
| 'https://commondatastorage.googleapis.com/perfetto-luci-artifacts/v54.0/android-x64/traceconv', | |
| 'sha256': | |
| '8d253f5a24e10a1f1022317670bb82cc1b0c6a5545d5ca3df41762d93152d01e' | |
| }, { | |
| 'arch': | |
| 'windows-amd64', | |
| 'file_name': | |
| 'traceconv.exe', | |
| 'file_size': | |
| 11050496, | |
| 'url': | |
| 'https://commondatastorage.googleapis.com/perfetto-luci-artifacts/v54.0/windows-amd64/traceconv.exe', | |
| 'sha256': | |
| '795e60d3649c9c243be52e9e310327c3f88b441e1514b666fa690aaace770cdd', | |
| 'platform': | |
| 'win32', | |
| 'machine': ['amd64'] | |
| }] | |
| # ----- Amalgamator: end of python/perfetto/prebuilts/manifests/traceconv.py | |
| # ----- Amalgamator: begin of python/perfetto/prebuilts/perfetto_prebuilts.py | |
| # Copyright (C) 2021 The Android Open Source Project | |
| # | |
| # Licensed under the Apache License, Version 2.0 (the "License"); | |
| # you may not use this file except in compliance with the License. | |
| # You may obtain a copy of the License at | |
| # | |
| # http://www.apache.org/licenses/LICENSE-2.0 | |
| # | |
| # Unless required by applicable law or agreed to in writing, software | |
| # distributed under the License is distributed on an "AS IS" BASIS, | |
| # WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied. | |
| # See the License for the specific language governing permissions and | |
| # limitations under the License. | |
| """ | |
| Functions to fetch pre-pinned Perfetto prebuilts. | |
| This function is used in different places: | |
| - Into the //tools/{trace_processor, traceconv} scripts, which are just plain | |
| wrappers around executables. | |
| - Into the //tools/{heap_profiler, record_android_trace} scripts, which contain | |
| some other hand-written python code. | |
| The manifest argument looks as follows: | |
| TRACECONV_MANIFEST = [ | |
| { | |
| 'arch': 'mac-amd64', | |
| 'file_name': 'traceconv', | |
| 'file_size': 7087080, | |
| 'url': https://commondatastorage.googleapis.com/.../trace_to_text', | |
| 'sha256': 7d957c005b0dc130f5bd855d6cec27e060d38841b320d04840afc569f9087490', | |
| 'platform': 'darwin', | |
| 'machine': 'x86_64' | |
| }, | |
| ... | |
| ] | |
| The intended usage is: | |
| from perfetto.prebuilts.manifests.traceconv import TRACECONV_MANIFEST | |
| bin_path = get_perfetto_prebuilt(TRACECONV_MANIFEST) | |
| subprocess.call(bin_path, ...) | |
| """ | |
| import hashlib | |
| import os | |
| import platform | |
| import random | |
| import subprocess | |
| import sys | |
| def download_or_get_cached(file_name, url, sha256): | |
| """ Downloads a prebuilt or returns a cached version | |
| The first time this is invoked, it downloads the |url| and caches it into | |
| ~/.local/share/perfetto/prebuilts/$tool_name. On subsequent invocations it | |
| just runs the cached version. | |
| """ | |
| dir = os.path.join( | |
| os.path.expanduser('~'), '.local', 'share', 'perfetto', 'prebuilts') | |
| os.makedirs(dir, exist_ok=True) | |
| bin_path = os.path.join(dir, file_name) | |
| sha256_path = os.path.join(dir, file_name + '.sha256') | |
| needs_download = True | |
| # Avoid recomputing the SHA-256 on each invocation. The SHA-256 of the last | |
| # download is cached into file_name.sha256, just check if that matches. | |
| if os.path.exists(bin_path) and os.path.exists(sha256_path): | |
| with open(sha256_path, 'rb') as f: | |
| digest = f.read().decode() | |
| if digest == sha256: | |
| needs_download = False | |
| if needs_download: # The file doesn't exist or the SHA256 doesn't match. | |
| # Use a unique random file to guard against concurrent executions. | |
| # See https://github.com/google/perfetto/issues/786 . | |
| tmp_path = '%s.%d.tmp' % (bin_path, random.randint(0, 100000)) | |
| print('Downloading ' + url) | |
| subprocess.check_call(['curl', '-f', '-L', '-#', '-o', tmp_path, url]) | |
| with open(tmp_path, 'rb') as fd: | |
| actual_sha256 = hashlib.sha256(fd.read()).hexdigest() | |
| if actual_sha256 != sha256: | |
| raise Exception('Checksum mismatch for %s (actual: %s, expected: %s)' % | |
| (url, actual_sha256, sha256)) | |
| os.chmod(tmp_path, 0o755) | |
| os.replace(tmp_path, bin_path) | |
| with open(tmp_path, 'w') as f: | |
| f.write(sha256) | |
| os.replace(tmp_path, sha256_path) | |
| return bin_path | |
| def get_perfetto_prebuilt(manifest, soft_fail=False, arch=None): | |
| """ Downloads the prebuilt, if necessary, and returns its path on disk. """ | |
| plat = sys.platform.lower() | |
| machine = platform.machine().lower() | |
| manifest_entry = None | |
| for entry in manifest: | |
| # If the caller overrides the arch, just match that (for Android prebuilts). | |
| if arch: | |
| if entry.get('arch') == arch: | |
| manifest_entry = entry | |
| break | |
| continue | |
| # Otherwise guess the local machine arch. | |
| if entry.get('platform') == plat and machine in entry.get('machine', []): | |
| manifest_entry = entry | |
| break | |
| if manifest_entry is None: | |
| if soft_fail: | |
| return None | |
| raise Exception( | |
| ('No prebuilts available for %s-%s\n' % (plat, machine)) + | |
| 'See https://perfetto.dev/docs/contributing/build-instructions') | |
| # Placeholder entries (e.g. before a release has been rolled) have an empty | |
| # URL. Treat them the same as a missing entry when soft_fail is set. | |
| if not manifest_entry.get('url'): | |
| if soft_fail: | |
| return None | |
| raise Exception('No prebuilt URL available for %s on %s-%s. ' | |
| 'The prebuilt may not have been rolled yet.' % | |
| (manifest_entry.get('file_name', '?'), plat, machine)) | |
| return download_or_get_cached( | |
| file_name=manifest_entry['file_name'], | |
| url=manifest_entry['url'], | |
| sha256=manifest_entry['sha256']) | |
| def run_perfetto_prebuilt(manifest): | |
| bin_path = get_perfetto_prebuilt(manifest) | |
| if sys.platform.lower() == 'win32': | |
| sys.exit(subprocess.check_call([bin_path, *sys.argv[1:]])) | |
| os.execv(bin_path, [bin_path] + sys.argv[1:]) | |
| # ----- Amalgamator: end of python/perfetto/prebuilts/perfetto_prebuilts.py | |
| if __name__ == '__main__': | |
| run_perfetto_prebuilt(TRACECONV_MANIFEST) | |
| #EOF |