| /* | |
| * Copyright (C) 2022 The Android Open Source Project | |
| * | |
| * Licensed under the Apache License, Version 2.0 (the "License"); | |
| * you may not use this file except in compliance with the License. | |
| * You may obtain a copy of the License at | |
| * | |
| * http://www.apache.org/licenses/LICENSE-2.0 | |
| * | |
| * Unless required by applicable law or agreed to in writing, software | |
| * distributed under the License is distributed on an "AS IS" BASIS, | |
| * WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied. | |
| * See the License for the specific language governing permissions and | |
| * limitations under the License. | |
| */ | |
| #include <string> | |
| #include "perfetto/base/build_config.h" | |
| #include "perfetto/base/logging.h" | |
| #include "perfetto/ext/base/file_utils.h" | |
| #include "perfetto/ext/base/pipe.h" | |
| #include "perfetto/ext/base/scoped_file.h" | |
| #include "perfetto/ext/base/string_utils.h" | |
| #include "perfetto/ext/base/temp_file.h" | |
| #include "perfetto/ext/base/unix_socket.h" | |
| #include "perfetto/ext/base/utils.h" | |
| #include "perfetto/ext/tracing/core/commit_data_request.h" | |
| #include "perfetto/ext/tracing/core/null_consumer_endpoint_for_testing.h" | |
| #include "perfetto/ext/tracing/core/trace_packet.h" | |
| #include "perfetto/ext/tracing/core/tracing_service.h" | |
| #include "perfetto/protozero/scattered_heap_buffer.h" | |
| #include "perfetto/tracing/core/data_source_config.h" | |
| #include "perfetto/tracing/core/tracing_service_state.h" | |
| #include "src/base/test/test_task_runner.h" | |
| #include "src/base/test/utils.h" | |
| #include "src/protozero/filtering/filter_bytecode_generator.h" | |
| #include "test/gtest_and_gmock.h" | |
| #include "test/test_helper.h" | |
| #include "protos/perfetto/config/test_config.gen.h" | |
| #include "protos/perfetto/config/trace_config.gen.h" | |
| #include "protos/perfetto/trace/perfetto/tracing_service_event.gen.h" | |
| #include "protos/perfetto/trace/test_event.gen.h" | |
| #include "protos/perfetto/trace/trace.gen.h" | |
| #include "protos/perfetto/trace/trace_packet.gen.h" | |
| #include "protos/perfetto/trace/trace_packet.pbzero.h" | |
| namespace perfetto { | |
| namespace { | |
| using ::testing::ContainsRegex; | |
| using ::testing::Each; | |
| using ::testing::ElementsAreArray; | |
| using ::testing::HasSubstr; | |
| using ::testing::Property; | |
| using ::testing::SizeIs; | |
| } // namespace | |
| TEST(PerfettoTracedIntegrationTest, NullConsumerEndpointBuilds) { | |
| NullConsumerEndpointForTesting npe; | |
| npe.StartTracing(); | |
| } | |
| TEST(PerfettoTracedIntegrationTest, TestFakeProducer) { | |
| base::TestTaskRunner task_runner; | |
| TestHelper helper(&task_runner); | |
| helper.StartServiceIfRequired(); | |
| helper.ConnectFakeProducer(); | |
| helper.ConnectConsumer(); | |
| helper.WaitForConsumerConnect(); | |
| TraceConfig trace_config; | |
| trace_config.add_buffers()->set_size_kb(1024); | |
| trace_config.set_duration_ms(200); | |
| auto* ds_config = trace_config.add_data_sources()->mutable_config(); | |
| ds_config->set_name("android.perfetto.FakeProducer"); | |
| ds_config->set_target_buffer(0); | |
| static constexpr size_t kNumPackets = 12; | |
| static constexpr uint32_t kRandomSeed = 42; | |
| static constexpr uint32_t kMsgSize = 1024; | |
| ds_config->mutable_for_testing()->set_seed(kRandomSeed); | |
| ds_config->mutable_for_testing()->set_message_count(kNumPackets); | |
| ds_config->mutable_for_testing()->set_message_size(kMsgSize); | |
| ds_config->mutable_for_testing()->set_send_batch_on_register(true); | |
| helper.StartTracing(trace_config); | |
| helper.WaitForTracingDisabled(); | |
| helper.ReadData(); | |
| helper.WaitForReadData(); | |
| const auto& packets = helper.trace(); | |
| ASSERT_EQ(packets.size(), kNumPackets); | |
| std::minstd_rand0 rnd_engine(kRandomSeed); | |
| for (const auto& packet : packets) { | |
| ASSERT_TRUE(packet.has_for_testing()); | |
| ASSERT_EQ(packet.for_testing().seq_value(), rnd_engine()); | |
| } | |
| } | |
| TEST(PerfettoTracedIntegrationTest, VeryLargePackets) { | |
| base::TestTaskRunner task_runner; | |
| TestHelper helper(&task_runner); | |
| helper.StartServiceIfRequired(); | |
| helper.ConnectFakeProducer(); | |
| helper.ConnectConsumer(); | |
| helper.WaitForConsumerConnect(); | |
| TraceConfig trace_config; | |
| trace_config.add_buffers()->set_size_kb(4096 * 10); | |
| trace_config.set_duration_ms(500); | |
| auto* ds_config = trace_config.add_data_sources()->mutable_config(); | |
| ds_config->set_name("android.perfetto.FakeProducer"); | |
| ds_config->set_target_buffer(0); | |
| static constexpr size_t kNumPackets = 7; | |
| static constexpr uint32_t kRandomSeed = 42; | |
| static constexpr uint32_t kMsgSize = 1024 * 1024 - 42; | |
| ds_config->mutable_for_testing()->set_seed(kRandomSeed); | |
| ds_config->mutable_for_testing()->set_message_count(kNumPackets); | |
| ds_config->mutable_for_testing()->set_message_size(kMsgSize); | |
| ds_config->mutable_for_testing()->set_send_batch_on_register(true); | |
| helper.StartTracing(trace_config); | |
| helper.WaitForTracingDisabled(); | |
| helper.ReadData(); | |
| helper.WaitForReadData(/* read_count */ 0, /* timeout_ms */ 10000); | |
| const auto& packets = helper.trace(); | |
| ASSERT_EQ(packets.size(), kNumPackets); | |
| std::minstd_rand0 rnd_engine(kRandomSeed); | |
| for (const auto& packet : packets) { | |
| ASSERT_TRUE(packet.has_for_testing()); | |
| ASSERT_EQ(packet.for_testing().seq_value(), rnd_engine()); | |
| size_t msg_size = packet.for_testing().str().size(); | |
| ASSERT_EQ(kMsgSize, msg_size); | |
| for (size_t i = 0; i < msg_size; i++) | |
| ASSERT_EQ(i < msg_size - 1 ? '.' : 0, packet.for_testing().str()[i]); | |
| } | |
| } | |
| // This is a regression test see b/169051440 for context. | |
| // | |
| // In this test we ensure that traced will not crash if a Producer stops | |
| // responding or draining the socket (i.e. after we fill up the IPC buffer | |
| // traced doesn't block on trying to write to the IPC buffer and watchdog | |
| // doesn't kill it). | |
| TEST(PerfettoTracedIntegrationTest, UnresponsiveProducer) { | |
| base::TestTaskRunner task_runner; | |
| TestHelper helper(&task_runner); | |
| helper.StartServiceIfRequired(); | |
| auto* producer = helper.ConnectFakeProducer(); | |
| helper.ConnectConsumer(); | |
| helper.WaitForConsumerConnect(); | |
| TraceConfig trace_config; | |
| trace_config.add_buffers()->set_size_kb(4096 * 10); | |
| trace_config.set_duration_ms(100); | |
| trace_config.set_flush_timeout_ms(1); | |
| trace_config.set_data_source_stop_timeout_ms(1); | |
| auto* ds_config = trace_config.add_data_sources()->mutable_config(); | |
| ds_config->set_name("android.perfetto.FakeProducer"); | |
| static constexpr size_t kNumPackets = 1; | |
| static constexpr uint32_t kRandomSeed = 42; | |
| static constexpr uint32_t kMsgSize = 1024 * 1024 - 42; | |
| ds_config->mutable_for_testing()->set_seed(kRandomSeed); | |
| ds_config->mutable_for_testing()->set_message_count(kNumPackets); | |
| ds_config->mutable_for_testing()->set_message_size(kMsgSize); | |
| ds_config->mutable_for_testing()->set_send_batch_on_register(true); | |
| // This string is just used to make the StartDataSource IPC larger. | |
| ds_config->set_legacy_config(std::string(8192, '.')); | |
| ds_config->set_target_buffer(0); | |
| // Run one legit trace, this ensures that the producer above is | |
| // valid and correct and mirrors real life producers. | |
| helper.StartTracing(trace_config); | |
| helper.WaitForProducerEnabled(); | |
| helper.WaitForTracingDisabled(); | |
| helper.ReadData(); | |
| helper.WaitForReadData(/* read_count */ 0, /* timeout_ms */ 10000); | |
| const auto& packets = helper.trace(); | |
| ASSERT_EQ(packets.size(), 1u); | |
| ASSERT_TRUE(packets[0].has_for_testing()); | |
| ASSERT_FALSE(packets[0].for_testing().str().empty()); | |
| helper.FreeBuffers(); | |
| // Switch the producer to ignoring the IPC socket. On a pixel 4 it took 13 | |
| // traces to fill up the IPC buffer and cause traced to block (and eventually | |
| // watchdog to kill it). | |
| helper.producer_thread()->get()->RemoveFileDescriptorWatch( | |
| producer->unix_socket_fd()); | |
| trace_config.set_duration_ms(1); | |
| for (uint32_t i = 0u; i < 15u; i++) { | |
| helper.StartTracing(trace_config, base::ScopedFile()); | |
| helper.WaitForTracingDisabled(/* timeout_ms = */ 20000); | |
| helper.FreeBuffers(); | |
| } | |
| // We need to readd the FileDescriptor (otherwise when the UnixSocket attempts | |
| // to remove it a the FakeProducer is destroyed will hit a CHECK failure. | |
| helper.producer_thread()->get()->AddFileDescriptorWatch( | |
| producer->unix_socket_fd(), []() {}); | |
| } | |
| TEST(PerfettoTracedIntegrationTest, DetachAndReattach) { | |
| base::TestTaskRunner task_runner; | |
| TraceConfig trace_config; | |
| trace_config.add_buffers()->set_size_kb(1024); | |
| trace_config.set_duration_ms(10000); // Max timeout, session is ended before. | |
| auto* ds_config = trace_config.add_data_sources()->mutable_config(); | |
| ds_config->set_name("android.perfetto.FakeProducer"); | |
| static constexpr size_t kNumPackets = 11; | |
| ds_config->mutable_for_testing()->set_message_count(kNumPackets); | |
| ds_config->mutable_for_testing()->set_message_size(32); | |
| // Enable tracing and detach as soon as it gets started. | |
| TestHelper helper(&task_runner); | |
| helper.StartServiceIfRequired(); | |
| auto* fake_producer = helper.ConnectFakeProducer(); | |
| helper.ConnectConsumer(); | |
| helper.WaitForConsumerConnect(); | |
| helper.StartTracing(trace_config); | |
| // Detach. | |
| helper.DetachConsumer("key"); | |
| // Write data while detached. | |
| helper.WaitForProducerEnabled(); | |
| auto on_data_written = task_runner.CreateCheckpoint("data_written"); | |
| fake_producer->ProduceEventBatch(helper.WrapTask(on_data_written)); | |
| task_runner.RunUntilCheckpoint("data_written"); | |
| // Then reattach the consumer. | |
| helper.ConnectConsumer(); | |
| helper.WaitForConsumerConnect(); | |
| helper.AttachConsumer("key"); | |
| helper.DisableTracing(); | |
| helper.WaitForTracingDisabled(); | |
| helper.ReadData(); | |
| helper.WaitForReadData(); | |
| const auto& packets = helper.trace(); | |
| ASSERT_EQ(packets.size(), kNumPackets); | |
| } | |
| // Tests that a detached trace session is automatically cleaned up if the | |
| // consumer doesn't re-attach before its expiration time. | |
| TEST(PerfettoTracedIntegrationTest, ReattachFailsAfterTimeout) { | |
| base::TestTaskRunner task_runner; | |
| TraceConfig trace_config; | |
| trace_config.add_buffers()->set_size_kb(1024); | |
| trace_config.set_duration_ms(250); | |
| trace_config.set_write_into_file(true); | |
| trace_config.set_file_write_period_ms(100000); | |
| auto* ds_config = trace_config.add_data_sources()->mutable_config(); | |
| ds_config->set_name("android.perfetto.FakeProducer"); | |
| ds_config->mutable_for_testing()->set_message_count(1); | |
| ds_config->mutable_for_testing()->set_message_size(32); | |
| ds_config->mutable_for_testing()->set_send_batch_on_register(true); | |
| // Enable tracing and detach as soon as it gets started. | |
| TestHelper helper(&task_runner); | |
| helper.StartServiceIfRequired(); | |
| helper.ConnectFakeProducer(); | |
| helper.ConnectConsumer(); | |
| helper.WaitForConsumerConnect(); | |
| auto pipe_pair = base::Pipe::Create(); | |
| helper.StartTracing(trace_config, std::move(pipe_pair.wr)); | |
| // Detach. | |
| helper.DetachConsumer("key"); | |
| // Use the file EOF (write end closed) as a way to detect when the trace | |
| // session is ended. | |
| char buf[1024]; | |
| while (PERFETTO_EINTR(read(*pipe_pair.rd, buf, sizeof(buf))) > 0) { | |
| } | |
| // Give some margin for the tracing service to destroy the session. | |
| usleep(250000); | |
| // Reconnect and find out that it's too late and the session is gone. | |
| helper.ConnectConsumer(); | |
| helper.WaitForConsumerConnect(); | |
| EXPECT_FALSE(helper.AttachConsumer("key")); | |
| } | |
| TEST(PerfettoTracedIntegrationTest, TestProducerProvidedSMB) { | |
| base::TestTaskRunner task_runner; | |
| TestHelper helper(&task_runner); | |
| helper.CreateProducerProvidedSmb(); | |
| protos::gen::TestConfig test_config; | |
| test_config.set_seed(42); | |
| test_config.set_message_count(1); | |
| test_config.set_message_size(1024); | |
| test_config.set_send_batch_on_register(true); | |
| // Write a first batch before connection. | |
| helper.ProduceStartupEventBatch(test_config); | |
| helper.StartServiceIfRequired(); | |
| helper.ConnectFakeProducer(); | |
| helper.ConnectConsumer(); | |
| helper.WaitForConsumerConnect(); | |
| TraceConfig trace_config; | |
| trace_config.add_buffers()->set_size_kb(1024); | |
| trace_config.set_duration_ms(200); | |
| auto* ds_config = trace_config.add_data_sources()->mutable_config(); | |
| ds_config->set_name("android.perfetto.FakeProducer"); | |
| ds_config->set_target_buffer(0); | |
| *ds_config->mutable_for_testing() = test_config; | |
| // The data source is configured to emit another batch when it is started via | |
| // send_batch_on_register in the TestConfig. | |
| helper.StartTracing(trace_config); | |
| helper.WaitForTracingDisabled(); | |
| EXPECT_TRUE(helper.IsShmemProvidedByProducer()); | |
| helper.ReadData(); | |
| helper.WaitForReadData(); | |
| const auto& packets = helper.trace(); | |
| // We should have produced two batches, one before the producer connected and | |
| // another one when the data source was started. | |
| ASSERT_EQ(packets.size(), 2u); | |
| ASSERT_TRUE(packets[0].has_for_testing()); | |
| ASSERT_TRUE(packets[1].has_for_testing()); | |
| } | |
| // Regression test for b/153142114. | |
| TEST(PerfettoTracedIntegrationTest, QueryServiceStateLargeResponse) { | |
| base::TestTaskRunner task_runner; | |
| TestHelper helper(&task_runner); | |
| helper.StartServiceIfRequired(); | |
| helper.ConnectConsumer(); | |
| helper.WaitForConsumerConnect(); | |
| FakeProducer* producer = helper.ConnectFakeProducer(); | |
| // Register 5 data sources with very large descriptors. Each descriptor will | |
| // max out the IPC message size, so that the service has no other choice | |
| // than chunking them. | |
| std::map<std::string, std::string> ds_expected; | |
| for (int i = 0; i < 5; i++) { | |
| DataSourceDescriptor dsd; | |
| std::string name = "big_ds_" + std::to_string(i); | |
| dsd.set_name(name); | |
| std::string descriptor(ipc::kIPCBufferSize - 64, | |
| static_cast<char>((' ' + i) % 64)); | |
| dsd.set_track_event_descriptor_raw(descriptor); | |
| ds_expected[name] = std::move(descriptor); | |
| producer->RegisterDataSource(dsd); | |
| } | |
| // Linearize the producer with the service. We need to make sure that all the | |
| // RegisterDataSource() calls above have been seen by the service before | |
| // continuing. | |
| helper.SyncAndWaitProducer(); | |
| // Now invoke QueryServiceState() and wait for the reply. The service will | |
| // send 6 (1 + 5) IPCs which will be merged together in | |
| // producer_ipc_client_impl.cc. | |
| auto svc_state = helper.QueryServiceStateAndWait(); | |
| ASSERT_GE(svc_state.producers().size(), 1u); | |
| std::map<std::string, std::string> ds_found; | |
| for (const auto& ds : svc_state.data_sources()) { | |
| if (!base::StartsWith(ds.ds_descriptor().name(), "big_ds_")) | |
| continue; | |
| ds_found[ds.ds_descriptor().name()] = | |
| ds.ds_descriptor().track_event_descriptor_raw(); | |
| } | |
| EXPECT_THAT(ds_found, ElementsAreArray(ds_expected)); | |
| } | |
| // Regression test for b/195065199. Check that trace filtering works when a | |
| // packet size exceeds the IPC limit. This tests that the tracing service, when | |
| // reassembling packets after filtering, doesn't "overglue" them. They still | |
| // need to be slice-able to fit into the ReadBuffers ipc. | |
| TEST(PerfettoTracedIntegrationTest, TraceFilterLargePackets) { | |
| base::TestTaskRunner task_runner; | |
| TestHelper helper(&task_runner); | |
| helper.StartServiceIfRequired(); | |
| helper.ConnectFakeProducer(); | |
| helper.ConnectConsumer(); | |
| helper.WaitForConsumerConnect(); | |
| TraceConfig trace_config; | |
| trace_config.add_buffers()->set_size_kb(1024 * 16); | |
| trace_config.set_duration_ms(500); | |
| auto* prod_config = trace_config.add_producers(); | |
| prod_config->set_producer_name("android.perfetto.FakeProducer"); | |
| prod_config->set_shm_size_kb(1024 * 16); | |
| prod_config->set_page_size_kb(32); | |
| static constexpr size_t kNumPackets = 3; | |
| static constexpr uint32_t kRandomSeed = 42; | |
| static constexpr uint32_t kMsgSize = 8 * ipc::kIPCBufferSize; | |
| auto* ds_config = trace_config.add_data_sources()->mutable_config(); | |
| ds_config->set_name("android.perfetto.FakeProducer"); | |
| auto* test_config = ds_config->mutable_for_testing(); | |
| test_config->set_seed(kRandomSeed); | |
| test_config->set_message_count(kNumPackets); | |
| test_config->set_message_size(kMsgSize); | |
| test_config->set_send_batch_on_register(true); | |
| protozero::FilterBytecodeGenerator filt; | |
| // Message 0: root Trace proto. | |
| filt.AddNestedField(1 /* root trace.packet*/, 1); | |
| filt.EndMessage(); | |
| // Message 1: TracePacket proto. Allow all fields. | |
| filt.AddSimpleFieldRange(1, 1000); | |
| filt.EndMessage(); | |
| trace_config.mutable_trace_filter()->set_bytecode(filt.Serialize().bytecode); | |
| // The data source is configured to emit another batch when it is started via | |
| // send_batch_on_register in the TestConfig. | |
| helper.StartTracing(trace_config); | |
| helper.WaitForTracingDisabled(); | |
| helper.ReadData(); | |
| helper.WaitForReadData(/* read_count */ 0, /* timeout_ms */ 10000); | |
| const std::vector<protos::gen::TracePacket>& packets = helper.trace(); | |
| EXPECT_EQ(packets.size(), kNumPackets); | |
| EXPECT_THAT(packets, | |
| Each(Property(&protos::gen::TracePacket::has_for_testing, true))); | |
| EXPECT_THAT( | |
| packets, | |
| Each(Property(&protos::gen::TracePacket::for_testing, | |
| Property(&protos::gen::TestEvent::str, SizeIs(kMsgSize))))); | |
| } | |
| #if (PERFETTO_BUILDFLAG(PERFETTO_START_DAEMONS) && \ | |
| PERFETTO_BUILDFLAG(PERFETTO_OS_ANDROID)) || \ | |
| PERFETTO_BUILDFLAG(PERFETTO_OS_LINUX) | |
| TEST(PerfettoTracedIntegrationTest, TestMultipleProducerSockets) { | |
| base::TestTaskRunner task_runner; | |
| auto temp_dir = base::TempDir::Create(); | |
| std::vector<std::string> producer_socket_names{ | |
| temp_dir.path() + "/producer1.sock", | |
| temp_dir.path() + "/producer2.sock", | |
| }; | |
| auto producer_sock_name = base::Join(producer_socket_names, ","); | |
| // We need to start the service thread for multiple producer sockets. | |
| TestHelper helper(&task_runner, TestHelper::Mode::kStartDaemons, | |
| producer_sock_name.c_str()); | |
| ASSERT_EQ(helper.num_producers(), 2u); | |
| helper.StartServiceIfRequired(); | |
| // Setup the 1st producer (default). | |
| helper.ConnectFakeProducer(); | |
| // Setup the 2ns producer. | |
| helper.ConnectFakeProducer(1); | |
| helper.ConnectConsumer(); | |
| helper.WaitForConsumerConnect(); | |
| TraceConfig trace_config; | |
| trace_config.add_buffers()->set_size_kb(1024); | |
| trace_config.set_duration_ms(200); | |
| static constexpr uint32_t kMsgSize = 1024; | |
| // Enable the 1st producer. | |
| auto* ds_config = trace_config.add_data_sources()->mutable_config(); | |
| ds_config->set_name("android.perfetto.FakeProducer"); | |
| ds_config->set_target_buffer(0); | |
| ds_config->mutable_for_testing()->set_message_count(12); | |
| ds_config->mutable_for_testing()->set_message_size(kMsgSize); | |
| ds_config->mutable_for_testing()->set_send_batch_on_register(true); | |
| // Enable the 2nd producer. | |
| ds_config = trace_config.add_data_sources()->mutable_config(); | |
| ds_config->set_name("android.perfetto.FakeProducer.1"); | |
| ds_config->set_target_buffer(0); | |
| ds_config->mutable_for_testing()->set_message_count(24); | |
| ds_config->mutable_for_testing()->set_message_size(kMsgSize); | |
| ds_config->mutable_for_testing()->set_send_batch_on_register(true); | |
| helper.StartTracing(trace_config); | |
| helper.WaitForTracingDisabled(); | |
| helper.ReadData(); | |
| helper.WaitForReadData(); | |
| const auto& packets = helper.trace(); | |
| ASSERT_EQ(packets.size(), 36u); | |
| for (const auto& packet : packets) { | |
| ASSERT_TRUE(packet.has_for_testing()); | |
| } | |
| for (const auto& sock_name : producer_socket_names) | |
| remove(sock_name.c_str()); | |
| } | |
| TEST(PerfettoTracedIntegrationTest, TestShmemEmulation) { | |
| base::TestTaskRunner task_runner; | |
| auto temp_dir = base::TempDir::Create(); | |
| std::string sock_name; | |
| { | |
| // Set up a server UnixSocket to find an unused TCP port. | |
| base::UnixSocket::EventListener event_listener; | |
| auto srv = base::UnixSocket::Listen("127.0.0.1:0", &event_listener, | |
| &task_runner, base::SockFamily::kInet, | |
| base::SockType::kStream); | |
| ASSERT_TRUE(srv->is_listening()); | |
| sock_name = srv->GetSockAddr(); | |
| // Shut down |srv| here to free the port. It's unlikely that the port will | |
| // be taken by another process so quickly before we reach the code below. | |
| } | |
| TestHelper helper(&task_runner, TestHelper::Mode::kStartDaemons, | |
| sock_name.c_str()); | |
| ASSERT_EQ(helper.num_producers(), 1u); | |
| helper.StartServiceIfRequired(); | |
| // Setup the 1st producer (default). | |
| helper.ConnectFakeProducer(); | |
| helper.ConnectConsumer(); | |
| helper.WaitForConsumerConnect(); | |
| TraceConfig trace_config; | |
| trace_config.add_buffers()->set_size_kb(1024); | |
| trace_config.set_duration_ms(200); | |
| static constexpr uint32_t kMsgSize = 1024; | |
| static constexpr uint32_t kRandomSeed = 42; | |
| // Enable the producer. | |
| auto* ds_config = trace_config.add_data_sources()->mutable_config(); | |
| ds_config->set_name("android.perfetto.FakeProducer"); | |
| ds_config->set_target_buffer(0); | |
| ds_config->mutable_for_testing()->set_seed(kRandomSeed); | |
| ds_config->mutable_for_testing()->set_message_count(12); | |
| ds_config->mutable_for_testing()->set_message_size(kMsgSize); | |
| ds_config->mutable_for_testing()->set_send_batch_on_register(true); | |
| helper.StartTracing(trace_config); | |
| helper.WaitForTracingDisabled(); | |
| helper.ReadData(); | |
| helper.WaitForReadData(); | |
| const auto& packets = helper.trace(); | |
| ASSERT_EQ(packets.size(), 12u); | |
| std::minstd_rand0 rnd_engine(kRandomSeed); | |
| for (const auto& packet : packets) { | |
| ASSERT_TRUE(packet.has_for_testing()); | |
| ASSERT_EQ(packet.for_testing().seq_value(), rnd_engine()); | |
| } | |
| } | |
| #endif | |
| } // namespace perfetto |