ui: add critical path measure to the Stitched Flamegraph Stitches slices through the scheduler's critical path (from sched.thread_executing_span): downstream, below the slice each sleep of the selected threads happened in, the slices of the threads running on its critical path; upstream, the threads blocked on the selected threads with the selected slices which ran on their critical path. Weighted by time on the critical path. Only the critical path frames overlapping the selection are flattened, and only for the roots whose frames overlap. Blocker slices are merged by (thread, name path) below the node they hang below, as the flamegraph would, before building it: a busy server blocking many clients otherwise yields millions of nodes.
Perfetto is an open-source suite of SDKs, daemons and tools which use tracing to help developers understand the behaviour of complex systems and root-cause functional and performance issues on client and embedded systems.
It is a production-grade tool that is the default tracing system for the Android operating system and the Chromium browser.
Perfetto is not a single tool, but a collection of components that work together:
Perfetto was designed to be a versatile and powerful tracing system for a wide range of use cases.
ftrace, allowing you to visualize scheduling, syscalls, interrupts, and custom kernel tracepoints on a timeline.chrome://tracing. Use it to debug and root-cause issues in the browser, V8, and Blink.We‘ve designed our documentation to guide you to the right information as quickly as possible, whether you’re a newcomer to performance analysis or an experienced developer.
New to tracing? If you're unfamiliar with concepts like tracing and profiling, start here:
Ready to dive in? Our “Getting Started” guide is the main entry point for all users. It will help you find the right tutorials and documentation for your specific needs:
Want the full overview? For a comprehensive look at what Perfetto is, why it's useful, and who uses it, see our main documentation page:
For users interested in the Debian distribution of Perfetto, the official source of truth and packaging efforts are maintained at Debian Perfetto Salsa Repository
Have questions? Need help?
We follow Google's Open Source Community Guidelines.