tree: 218cad8e495485b0da42dc138990eaede289a7c0 [search]
  1. perfetto/
  2. README.md
include/README.md

Perfetto public API surface

This API surface is not stable yet, don't depend on it

This folder contains the public perfetto API headers. This allows an app to inject trace events into perfetto with ~10 lines of code (see examples in examples/sdk/).

The ext/ subdirectory expose the API-unstable classes and types that are exposed to emvbedders that have exceptional requirements in terms of interposing their own custom IPC layer. To the day the only case is chromium. Nothing else should depend on ext/. Contact perfetto-dev@ if you think you need to depend on an ext/ header.

Headers in this folder must be hermetic. No ext/ perfetto header must be leaked from the includes.

What is a client supposed to do to use tracing? See example below in this page.

Source code layout: what goes where?

include/perfetto: Embedders are allowed to access and depend on any folder of this but ext/. This contains classes to: (i) use tracing; (ii) extend the tracing internals (i.e. implement the Platform).

Rules:

  • This directory should contain only .h files and no .cc files.
  • Corresponding .cc files go into src/.
  • .h files in here can depend only on include/perfetto/ but not on include/perfetto/ext/,

include/perfetto/tracing/internal: This directory contains headers that are required to implement the public-facing tracing API efficiently but that are not part of the API surface. In an ideal world there would be no need of these headers and everything would be handle via forward-declarations and PIMPL patterns. Unfortunately, however, PIMPL cannot be used for inline functions, where the implementation needs to be exposed in the public headers, which in turn need to depend on the memory layout of structs/classes.

Rules:

  • All classes / types declared in this folder must be wrapped in the ::perfetto::internal namespace.
  • Both public and internal .h headers must not pull other perfetto headers from ext/.
  • .cc files instead can depend on other perfetto classes, as well as .h headers located in src/.
  • Embedders must not depend on the perfetto::internal namespace.
  • Internal types cannot be used as input, output or return arguments of public API functions.
  • Internal types cannot be directly exposed to virtual methods that are intended to be called or overridden by the embedder (e.g. TracingBackend's methods). For those the solution is to create a matching non-internal base class with a static factory method.
  • We don't guarantee binary compatibility between versions (i.e. this client library can only be statically linked) but we guarantee source-level compatibility and ABI of the UNIX socket and shared memory buffers.

include/perfetto/public: This contains headers that can be used when dynamic linking with the perfetto shared library.

These headers are not supposed to be exposed as part of the shared library ABI.

All symbols, macros and types here start with the perfetto_, PERFETTO_ or Perfetto prefix. These prefixes are reserved and should not be used elsewhere when linking with the perfetto shared library.

include/perfetto/public/abi: Subset of headers that are part of the shared library ABI (not stable yet). These headers are supposed to be hermetic (i.e. they should not include anything outside the abi directory).

Usage example

  1. Call perfetto::Tracing::Initialize(...) once, when starting the app. While doing so the app can chose the tracing model:
  • Fully in-process: the service runs in a thread within the same process.
  • System: connects to the traced system daemon via a UNIX socket. This allows the app to join system-wide tracing sessions. This is available only on Linux/Android/MacOS for now.
  • Private dedicated process: similar to the in-process case, but the service runs in a dedicated process rather than a thread. This is for performance, stability and security isolation. Also, this is not implemented yet.
  • Custom backend: this is for peculiar cases (mainly chromium) where the embedder is multi-process but wants to use a different IPC mechanism. The embedder needs to deal with the larger and clunkier set of perfetto APIs. Reach out to the team before using this mode. It's very unlikely you need this unless you are a project rolled into chromium.
  1. Define and register one or more data sources, like this:
  #include "perfetto/tracing.h"

  class MyDataSource : public perfetto::DataSource<MyDataSource> {
    void OnSetup(const SetupArgs&) override {}
    void OnStart(const StartArgs&) override {}
    void OnStop(const StopArgs&) override {}
  };
  ...
  perfetto::DataSourceDescriptor dsd;
  dsd.set_name("my_data_source");
  MyDataSource::Register(dsd);
  1. Optionally define a new proto schema in trace_packet.proto

  2. Emit trace events

  MyDataSource::Trace([](MyDataSource::TraceContext ctx) {
      auto trace_packet = ctx.NewTracePacket();
      trace_packet->set_timestamp(...);
      auto* my_custom_proto = trace_packet->set_my_custom_proto();
  });

The passed lambda will be called only if tracing is enabled and the data source was enabled in the trace config. It might be called multiple times, one for each active tracing session, in case of concurrent tracing sessions (or even within a single tracing session, if the data source is listed twice in the trace config).