| #!/usr/bin/env python3 | |
| # Copyright (C) 2020 The Android Open Source Project | |
| # | |
| # Licensed under the Apache License, Version 2.0 (the "License"); | |
| # you may not use this file except in compliance with the License. | |
| # You may obtain a copy of the License at | |
| # | |
| # http://www.apache.org/licenses/LICENSE-2.0 | |
| # | |
| # Unless required by applicable law or agreed to in writing, software | |
| # distributed under the License is distributed on an "AS IS" BASIS, | |
| # WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied. | |
| # See the License for the specific language governing permissions and | |
| # limitations under the License. | |
| import argparse | |
| import os | |
| import sys | |
| import unittest | |
| from test import api_integrationtest | |
| from test import bigtrace_api_integrationtest | |
| from test import open_trace_in_ui_unittest | |
| from test import query_result_iterator_unittest | |
| from test import resolver_unittest | |
| from test import stdlib_unittest | |
| from test import unix_unittest | |
| ROOT_DIR = os.path.dirname(os.path.dirname(os.path.abspath(__file__))) | |
| sys.path.append(os.path.join(ROOT_DIR)) | |
| def main(): | |
| try: | |
| import numpy | |
| import pandas | |
| except ModuleNotFoundError: | |
| print('Cannot proceed. Please `pip3 install pandas numpy`', file=sys.stderr) | |
| return 1 | |
| # Set paths to trace_processor_shell and root directory as environment | |
| # variables | |
| parser = argparse.ArgumentParser() | |
| parser.add_argument("host_out_path", type=str) | |
| host_out_path = parser.parse_args().host_out_path | |
| os.environ["SHELL_PATH"] = f"{host_out_path}/trace_processor_shell" | |
| os.environ["ORCHESTRATOR_PATH"] = f"{host_out_path}/orchestrator_main" | |
| os.environ["WORKER_PATH"] = f"{host_out_path}/worker_main" | |
| os.environ["ROOT_DIR"] = ROOT_DIR | |
| loader = unittest.TestLoader() | |
| suite = unittest.TestSuite() | |
| # Add all relevant tests to test suite | |
| suite.addTests(loader.loadTestsFromModule(open_trace_in_ui_unittest)) | |
| suite.addTests(loader.loadTestsFromModule(query_result_iterator_unittest)) | |
| suite.addTests(loader.loadTestsFromModule(resolver_unittest)) | |
| suite.addTests(loader.loadTestsFromModule(api_integrationtest)) | |
| suite.addTests(loader.loadTestsFromModule(stdlib_unittest)) | |
| suite.addTests(loader.loadTestsFromModule(unix_unittest)) | |
| if os.path.exists(os.environ["WORKER_PATH"]): | |
| suite.addTests(loader.loadTestsFromModule(bigtrace_api_integrationtest)) | |
| # Initialise runner to run all tests in suite | |
| runner = unittest.TextTestRunner(verbosity=3) | |
| result = runner.run(suite) | |
| return 0 if result.wasSuccessful() else 1 | |
| if __name__ == '__main__': | |
| sys.exit(main()) |